Recent Notable Installation:

 

  • In June-September 2008, Synthetic Plastering completed 3 Taco Bell Locations, which were located in Rochester (2855 S. Rochester Road), Utica (45201 Schoener) and Allen Park (3333 Fairlane Drive), MI. These projects consisted of approximately 3,000 Square Feet of E.I.F.S and cultured stone each. We used Senergy’s Channeled Adhesive Design System, which consist of; Senersheild R and/or Tyvek Stucco Wrap over substrate (to waterproof), a drainage track with weep holes (placed at the bottom of the substrate), foam, the base coat (cement coat), reinforced fiber glass mesh (to make it a hard shell), and finally the finish coat gives it the color and texture (applied with a hawk & trowel). The finish chosen was a fine finish using five color tones.

 

  • In August 2008, Synthetic Plastering remodeled New Bethel Baptist Church, located at 8430 Linwood, Detroit, MI. This project consisted of approximately 10,000 Square Feet of E.I.F.S. This project was installed using Senergy’s Standard System, which consists of; foam, Base Coat (cement coat), reinforced fiber glass mesh (to make it a hard shell), and then the finish coat is applied. This project has two color tones with accent bands and lettering with sahara texture.

 

  • In September 2008, Synthetic Plastering remodeled a personal residence, which is located in Fenton, MI. This project was roughly 3,500 Square Feet of E.I.F.S. This project consisted of demo existing substrait and re-board Hardiplank fascia and sofit. Then to install E.I.F.S using Senergys Water Managed System, using Silcolit finish, which is a mold resistance finish. We applied two color tones.

 

  • In September 2008, Synthetic Plastering completed Ulta located at 2813 Rochester Road, Rochester Hills, MI. This project consisted of approximately 2,500 Square feet of E.I.F.S using three-color tones in classic finish with light design to tie in with existing center.

 

 

 

 

 

Your comments and questions are welcomed: