Recent
Notable Installation:
- In June-September 2008, Synthetic Plastering completed
3 Taco Bell Locations, which were located in Rochester (2855
S. Rochester Road), Utica (45201 Schoener) and Allen Park
(3333 Fairlane Drive), MI. These projects consisted of
approximately 3,000 Square Feet of E.I.F.S and cultured
stone each. We used Senergy’s Channeled Adhesive Design
System, which consist of; Senersheild R
and/or Tyvek Stucco Wrap over substrate (to waterproof), a
drainage track with weep holes (placed at the bottom of the
substrate), foam, the base coat (cement coat),
reinforced fiber glass mesh (to make it a hard shell), and
finally the finish coat gives it the color and texture
(applied with a hawk & trowel). The finish chosen was a
fine finish using five color tones.
- In August 2008, Synthetic Plastering remodeled New
Bethel Baptist Church, located at 8430 Linwood, Detroit, MI.
This project consisted of approximately 10,000 Square Feet
of E.I.F.S. This project was installed using Senergy’s Standard System, which
consists of; foam, Base Coat (cement coat), reinforced fiber
glass mesh (to make it a hard shell), and then the finish
coat is applied. This project has two color tones with
accent bands and lettering with sahara texture.
- In September 2008, Synthetic Plastering remodeled
a personal residence, which is located in Fenton, MI. This
project was roughly 3,500 Square Feet of E.I.F.S. This
project consisted of demo existing substrait and re-board Hardiplank
fascia and sofit. Then to install E.I.F.S using Senergys Water
Managed System, using Silcolit finish, which is a mold
resistance finish. We applied two color tones.
- In September 2008, Synthetic Plastering completed
Ulta located at 2813 Rochester Road, Rochester Hills, MI.
This project consisted of approximately 2,500 Square feet of
E.I.F.S using three-color tones in classic finish with light
design to tie in with existing center.
|